Find Generator, Genset, Diesel Generator on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)

The Latest Product Alerts Send Me

Automatic Diesel Power Plant Station Generator

Product Description

Production Description                                                                                             

Description of characteristics of automatic diesel Generator set

1. Maintain the continuity and reliability of power supply.

The automatic control system of diesel generator sets can adjust the operation of diesel generator sets accurately and quickly.
When the generator set appears abnormal condition, the automatic control system can make normal judgment and timely treatment, send corresponding alarm signal and emergency stop, to avoid damage to the generator set. At the same time, it can automatically start the standby generator set, shorten the power outage time and ensure the continuity of power supply.

2. Improve the power quality index and operation economy, and make each electric equipment in good working condition. Electrical equipment has high requirements on the frequency and voltage of electric energy, and the allowable deviation range is very small. The automatic voltage regulator keeps the voltage constant and operates the governor to regulate the frequency. Automatic diesel power stations rely on automatic regulating devices to regulate frequency and useful power.

3. Accelerate the control and operation process, and improve the continuity and stability of the system. After realizing the automation of diesel power station, it can timely change the operation status and adapt to the system requirements, and the unit operation process can be carried out according to the predetermined sequence without interruption, and the completion status can be continuously monitored. Take emergency starting generator set as an example. If manual operation is adopted, the fastest time is 5-7 minutes. If automatic control is adopted, it usually takes less than 10 seconds to start successfully and restore power supply.

4. Reduce operating energy and improve working conditions. The operating environment of the machine room is very bad, which affects the health of the operators. The automatic control system creates the condition for unattended duty.



Main functions of automatic diesel generator set

As a backup power supply, the automatic diesel generator set should have the following basic functions

Automatic start when the power failure, power failure, undervoltage, overvoltage, missing phase, the unit can automatically start, automatically raise speed, automatically close, to the load power supply.

Automatic shutdown when the power is restored, after judging the normal, control the switch to complete the automatic switch from power generation to power, and then control the unit to slow down, idle operation for 3 minutes after the automatic shutdown.

In the process of operation, if the oil pressure is too low, overspeed, abnormal voltage fault, then emergency stop, and send out a sound and light alarm signal, if the water temperature is high, high oil temperature fault. Then send out sound and light alarm signal, after the delay, the normal stop.

The unit has three startup functions. If the first startup is unsuccessful, it will be started again after a 10-second delay. If the second startup is unsuccessful, it will be started three times after delay. As long as there is a success in the three starts, it will follow the pre-set program to run down, if three consecutive starts are not successful, it will be considered as a failure to start, send out a sound and light alarm signal, also can control the start of another unit at the same time.

Automatic maintenance quasi-starting state the unit can automatically maintain the quasi-starting state. At this time, the unit's automatic periodic pre-oil supply system, the automatic heating system of oil and water, the battery's automatic charging device into operation.

When the unit is not started for a long time, the maintenance can be started to check the performance and status of the unit. Maintenance-starting does not affect the normal power supply of the maintenance-starting, if there is a maintenance-starting fault, the system will automatically switch to the normal power-on state and be supplied by the unit.

With manual, automatic two operating modes.



Hardware design of control system of automatic diesel generator set

1, according to the required input and output points to choose the PLC model, according to the control requirements of the automation unit required PLC input points for 11, output points for 12. The control quantity of the system is basically the on-off quantity, only the voltage and rotation speed are the analog quantities. In order to reduce the cost, analog quantities can be converted into switching quantities by detecting circuits. This can choose not to take analog input PLC. This system USES C28P - CDR - D small programmable controller, high reliability, small volume, 16 input points, 12 output points. The power supply, input and output voltages are all 24VDC.

2. PlC input and output: control PlC input and output signals according to the control requirements of the automation unit and the electrical principle.

3. Program design of control system: when the switch of the automation unit hits the automatic position, the unit is in the quasi-starting state. PLC to carry out uninterrupted cycle detection, pre-supply oil pump periodically to the diesel engine lubricating oil channel, diesel engine cooling water and oil temperature to ensure that the unit at any time emergency start. In the quasi-starting state, once the power loss, undervoltage, overvoltage and equal failure occurs, and after 5 seconds of confirmation, PLc control unit automatic start, automatic speed up to the rated speed, automatic protection input. When the unit works normally, the control switch switches to the power generation state and the unit closes to supply power to the load. When the mains power returns to normal, after the delay of 5 seconds to confirm, disconnect the unit output switch, control the switch switch to switch to the state of mains power, the unit will automatically slow down to idle state, after running for 3 minutes, the unit will automatically stop, and the unit will be in a quasi-starting state.



Detailed image                                                                                                            
Automatic Diesel Power Plant Station Generator



Package&Delivery                                                                                                       

Automatic Diesel Power Plant Station Generator

Company introduction                                                                                               

SZMC is founded in 1989, is the predecessor of Xintai City crane factory, restructuring in 2005. Over the years the company continued to introduce domestic and foreign advanced production technology, absorb the specialized, high-quality professionals, the company strong technical force, advanced process equipment, has a professional engineering and technical personnel, first-class installation team, excellent after sale service, and took the lead through the ISO9001 international quality system certification, with independent intellectual property rights and industrial property rights. With ten series over 60 varieties and various non-standard lifting equipment production capacity, product selling more than 30 domestic provinces and cities and more than 50 countries and regions.
 

Automatic Diesel Power Plant Station Generator

Certificate                                                                                                                    
Automatic Diesel Power Plant Station Generator

FAQ                                                                                                                                


Q: Are you factory?

A: Yes, we are factory with 31 years old.

Q: How long is your warranty?

Our warranty is 24 months after received the goods.

3. The usage period.

About 30 years under common use.

4. How can we install the crane?

Our senior engineer can be your side to do the installation guide service and training.


If you want our products, please contact with us ASAP! We will do our best for you!






 

Contact us if you need more details on Generator. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Genset、Diesel Generator. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Generator